Installation of a spray dryer and support structure

Bonding Line Installation Project

Goodhart Sons, Inc. was contracted by a laminate flooring manufacturer to perform a turnkey installation of a new bonding line and dust collection system. Goodhart Sons, Inc. was responsible for the overall project management of the entire project. The detailing and fabrication consisted of a dust collection system, structural steel supports, and access platforms. The mechanical installation consisted of the new bonding line equipment, ductwork, steelwork, and equipment for the dust collection system including civil work, electrical, piping, and insulation.