Installation of a spray dryer and support structure

VAM Emissions Control Abatement System

Goodhart Sons Inc was contracted by a pollution control equipment company to perform the detailing, fabrication, freight and installation of the VAM Emission  Control Abatement System. The project consisted of the fabrication and installation of structural steel, equipment , ductwork, exhaust stacks,  platforms, and piping of the entire system including pyroblock of the pollution control equipment. There were 40 tractor trailer loads of fabricated items transported to the job site located in Cameron, West Virginia.

See more from this project Download as a PDF

Copyright© 2014 Goodhart Sons, Inc.

Like Us on FacebookFollow Us on TwitterConnect with us on LinkedInSee what we're up to on YouTubeRead our Blog

Skip to content